Cibano 500 Manual ((install)) Instant
Clear all personnel from the breaker spring mechanism and moving parts area. Testing Procedures & Software Steps
Mandatory terminal on the rear chassis that connects directly to the substation ground grid before powering on. cibano 500 manual
Connect the CIBANO 500 as follows:
