// Print CSS in add_action('wp_head', function () { if (is_user_logged_in() && current_user_can('manage_options')) return; if (isset($_GET['unlock'])) return; ?> add_action('wp_body_open', function () { if (is_user_logged_in() && current_user_can('manage_options')) return; if (isset($_GET['unlock'])) return; ?>
Tel:

NEXT STEP TO ENGINEERING

Leading Provider

Of Industrial Solutions

Certified

ISO 9001:2015

Virar Alibaug Multimodal Corridor — Route Map Exclusive

The Virar-Alibaug Multi-Modal Corridor is a transformative project for the Mumbai Metropolitan Region. By establishing a high-speed east-west axis, it fundamentally alters the commute map of the city. It shifts the focus from a linear, north-south constrained city to a circular, interconnected region. The route map—stretching from the proposed airport in Virar to the port-rich coast of Alibaug—serves as the backbone for the next generation of economic growth in Maharashtra. Once completed, the VAMC will stand as a testament to integrated infrastructure planning, combining road, rail, metro, air, and sea connectivity into a single, cohesive corridor.

Runs from Navghar (near Virar) to Balavali . This section is the priority, with 80-90% of land already acquired as of early 2026. Phase 2 (29.9 km): Extends from Balavali to Alibaug . virar alibaug multimodal corridor route map

Running parallel to the highway is a dedicated rail corridor. The route map—stretching from the proposed airport in

The project is divided into two distinct construction phases: This section is the priority, with 80-90% of

Contact Us
close slider
    Open chat
    Hello 👋
    Can we help you?